Print View
2025 NHS Building Construction House Bids Requested
WRITTEN BY Michael Hintzman ON February 26, 2025

BIDS REQUESTED – NHS BUILDING CONSTRUCTION HOUSE

SCHOOL DISTRICT OF MAPLE
MAPLE, WISCONSIN 54854

A new home shell, one story, 24' x 36' with two bedrooms, kitchen, living room, dining room, utility room, and one full bathroom framed in, will be sold to the highest bidder over a minimum of $43,500.   The house is located at Northwestern High School, in Maple, WI. The features of this home are as follows:

  1. LPI 20 Series, 9/1/2” I-Joists floor framing with LP Legacy floor sheathing
  2. 2x6 exterior wall construction
  3. Engineered roof truss system with 1’ heel height - 6/12 pitch
  4. 5/8” OSB used on the roof sheathing
  5. 7/16” OSB used on wall sheathing with Tyvek house wrap
  6. Great room ceiling is vaulted - 3/12 vaulted interior
  7. LP Smart Siding, Diamond Kote (Glacier Fog with Coffee trim)
  8. Rollex brand aluminum soffits and fascia (Mocha)
  9. Insulated Marvin Elevate windows, Low E with Argon, with screens throughout (Almond Frost) with bare pine interior
  10. Matching Marvin Elevate sliding french door
  11.  Bayer Built insulated entry door, aluminum clad jambs
  12. Roof shingled with Certainteed Landmark Architectural shingles and ridge vent (Burnt Sienna)

Bids requested on a new home according to the instructions below:

  • This house is being sold as a shell. The interior of the building is framed in, but plumbing, finished flooring, sheetrock, insulation, etc. has not been completed.  The house is wired for switches, outlets, and breaker panel. However, it does not include breakers and lighting fixtures.  The house is open for inspection by appointment only, Monday through Friday, from 8:00 a.m. to 3:00 p.m. prior to April 14, 2025. Contact the District Office @ 715-363-2431 to make an appointment.
  • A certified check in the amount of ten (10) percent of the bid price and a letter from a financial institution stating that the bidder has been pre-approved for their bid dollar amount must accompany the bid. If, after submitting the bid on the house, the successful bidder decides not to purchase the house, the ten (10) percent bid bond will be forfeited. The house must be paid for in full before removal from the school district premises. Removal must be no later than August 15, 2025. It is recommended that bidders have their plans for site development finalized prior to submitting a bid. 
  • The Maple School Board reserves the right to accept or reject any or all bids. All bids must be enclosed in a sealed envelope marked "House Bid" addressed to the Board of Education, School District of Maple, P.O. BOX 188, Maple, WI 54854.
  • Bids will be accepted until 4:00 p.m. on Monday, April 14, 2025. Bids received will be presented to the School Board at their regular meeting scheduled for Monday, April 14, 2025 at 5:00 p.m.
  • Click here for the posting PDF with pictures

 






For technical questions and comments regarding this website, please contact the Webmaster.